Lodge Hill
In January 2013, we submitted a package of material to the Core Strategy Planning Inspector before the examination was reopened. This included a Position Statement summarising the work that had been carried out during the suspension of the Examination in September 2012.
It was supported by information relating to the assessment of a mitigation or compensation package for nightingale habitat, a revision of the Sustainability Appraisal of the draft Core Strategy in the form of an addendum report, and papers relating to the consideration of a SSSI notification at Lodge Hill.
As a historic record, this material can be found below, along with the reference number for each study or document submitted to the Planning Inspectorate.